CBG Park

Powering India's Bio-CNG Future

18 plants across 6 states, one mission.

Bio-CNG Infrastructure — Schematic 01

What is a CBG Park?

An integrated industrial ecosystem for the production, processing, utility management, logistics coordination, and future expansion of Bio-CNG infrastructure — feedstock handling, digestion, gas upgrading, power integration, heat recovery, storage, logistics, and utilities, run as one connected system.

Live Snapshot

8
Units integrated
Multi-point
Feedstock streams
Pipeline
Output grade
24/7
Monitoring
System statusOnline

01Organic waste streams enter the park from multiple supply points.

Trunk line runs feedstock → distribution, continuously

The Park Advantage

Why a CBG Park?

A standalone Bio-CNG plant solves one site's problem. A park solves the infrastructure problem — sharing utilities, feedstock, monitoring and logistics across every plant it hosts.

Shared Infrastructure, Lower Capex

Roads, power, water and gas utilities are built once and shared across every plant in the park — cutting the capital a standalone facility would carry alone.

Faster Time-to-Operation

Land, approvals and utility connections are cleared at the park level, so new plants move from groundbreaking to production in a fraction of the usual timeline.

Pooled Feedstock Security

Multiple plants draw from a shared, aggregated feedstock network — smoothing out the supply swings any single site would face on its own.

Centralized Monitoring & Quality

One digital layer watches every digester across the park, keeping throughput and gas quality consistent from site to site.

Stronger Offtake & Logistics

Consolidated volumes give the park more leverage with offtake buyers and shared distribution routes than any individual plant could negotiate.

Built for the Circular Economy

Every plant converts agricultural and organic waste into clean Bio-CNG — cutting emissions and giving farmers a steady market for feedstock residue.

The park model turns individual Bio-CNG plants into one coordinated system — built to run efficiently today and expand without friction tomorrow.

18
Plants
6
States
1
Shared Ecosystem
8 connected units

The Ecosystem Approach

Each unit feeds the next — from raw feedstock to operational intelligence — reducing friction and building room for the park to scale.

Feedstock Collection & AggregationCBG-01
01

Feedstock Collection & Aggregation

Sources and consolidates organic input from multiple supply points into a steady, park-wide stream.

Pre-processing & SmartMix OptimizationCBG-02
02

Pre-processing & SmartMix Optimization

Sorts, conditions, and blends feedstock ratios to keep digester performance consistent.

Anaerobic Digestion & HydroReact Process IntegrationCBG-03
03

Anaerobic Digestion & HydroReact Process Integration

Breaks down organic matter under controlled conditions, tuned for stable, higher-yield gas output.

Gas Upgrading through MethaPure SystemsCBG-04
04

Gas Upgrading through MethaPure Systems

Purifies raw biogas into pipeline- and vehicle-grade Bio-CNG.

Heat Recovery with BioHeatCBG-05
05

Heat Recovery with BioHeat

Captures process heat and routes it back into the system, cutting overall energy loss.

Utility Synchronization through EnergySyncCBG-06
06

Utility Synchronization through EnergySync

Balances power, water, and thermal loads across every unit in the park in real time.

Digital Monitoring using DigiDigest & PlantVisionCBG-07
07

Digital Monitoring using DigiDigest & PlantVision

Tracks digester health and plant conditions continuously, surfacing issues before they escalate.

Operational Intelligence via ProcessSense & BioFlow IQCBG-08
08

Operational Intelligence via ProcessSense & BioFlow IQ

Turns live plant data into tuning recommendations that keep throughput and quality on target.

Coordinated system

Built for coordination, less friction, and room to scale over time.

Gas flow Process unit Instrumentation tag
KEC CBG Park

Let’s Discuss Your Next
Bio-CNG Infrastructure Opportunity

Connect with KEC’s engineering and ecosystem team for a strategic discussion on CBG Park development, infrastructure planning, and integrated clean-energy deployment.

Talk to KEC Team

Build It Right. Build It With KEC.

CBG Park walkthrough
KEC Logo